Skip to Main Content

News & Publications

Bulletin • 3/31/2026

OIG Bulletin, March 2026

This edition of the OIG Bulletin includes information on several OIG reports including the Special Education Transportation study, the preliminary report on Sheriffs’ spending, and the Steamship Authority’s website project. Also contains information on prevailing wage misconceptions and the benefits of the CM at-Risk delivery method.

Read the Bulletin

Guides & Manuals • 6/25/2025

Construction Management at-Risk Application to Proceed 

Apply for a Notice to Proceed to use the construction management at-risk delivery method to procure a contract for the construction, reconstruction, installation, demolition, maintenance, or repair of any building estimated to cost $5 million or more.

View the Guide

Letter • 1/22/2025

Response Letter from Li-Ro Hill re: Dexter Park and Fisher Hill – Disposal of Surplus Inventory

The Li-Ro Construction Management Company responded to the October 18, 2024 letter from the OIG concerning the disposal of surplus inventory in the town of Orange.

Read the Letter

Guides & Manuals • 11/5/2023

Designing and Constructing Public Facilities Manual 

The Designing and Constructing Public Facilities Manual contains information about requirements and recommendations for awarding public construction project contracts.

View the Manual

Press Release • 9/21/2023

IG Shapiro Calls On School Building Authority To Adopt Measures To Mitigate Risks Of Smart Building Technology

IG Shapiro asked the Massachusetts School Building Authority to consider measures to mitigate risks of smart technology when funding school building projects.

Read the Press Release

Guides & Manuals • 7/3/2023

Design-Build Application to Proceed

Use this design-build application on a project-specific basis to procure a contract for the construction, reconstruction, alteration, remodeling, or repair of any public works project estimated to cost $5 million or more.

View the Guide

Report • 10/25/2005

Experience Of Massachusetts Public Agencies with Construction Management at-Risk Under M.G.L. c. 149a

The OIG conducted a legislatively mandated review of the Construction Management-at Risk alternative procurement method for public building projects. The study provides public owners with an interest in using CM-at Risk with valuable data, procedural information, and practical advice.

Read the Report

Review • 8/16/1998

Qualifying Contractors for Public Building Projects: A Case Study and System Review

The OIG initiated a review of deficient construction projects in three municipalities undertaken by a contractor that had been deemed qualified to bid on public building contracts.

Read The Review

Report • 7/2/1997

Lease-Purchase Financing of a Design-Build Project: The Plymouth County Correctional Facility

The OIG released a report concerning the Plymouth County correctional facility, which was financed and built using nontraditional methods authorized by special legislation enacted in 1991. The review focused on the project’s financial structure, management, and results.

Read the Report